West Reading Elementary Center

Addressing decades of wear
Originally built in 1953 as a K–6 facility reliant on the adjacent high school for core services, West Reading Elementary Center underwent piecemeal updates in 1968, 1998, and 2004 to house the district’s entire fifth- and sixth-grade population.
Over time, administrative and health suites were wedged into standard classrooms without direct ADA accessibility, while support programs operated out of former storage closets.
As the oldest facility in the district, the building required a comprehensive overhaul to modernize its aging layout and infrastructure.
Accelerating delivery via off-site construction
Hemmed in on a tight 1.3-acre urban site, the project team used permanent off-site modular construction to minimize on-site material storage and shorten the construction schedule to a single spring semester.
While foundation work progressed on-site, a two-story addition was built off-site to house a lower-level library, a main-level administrative and nurse’s suite, and three second-floor special education classrooms.

Comprehensive systemic + interior modernization
While students were temporarily relocated off-site, crews completely overhauled the existing building envelope and building systems.
Upgrades included replacing all electrical, plumbing, and fire alarm systems, retrofitting full-building fire sprinklers, installing modern instructional technology, and adding air conditioning throughout the facility.
To complete the transformation, interior spaces received new windows, flooring, ceilings, paint, age-appropriate casework, and fresh wall tile over legacy corridor block.